Northcliffe project 2nd phase:
This project was the perfect size to work in a scale economy in the construction area. Which lowered the cost of material and labor.
Another benefit of having all in the same location is that allowed me to start different scopes at the same time. We were still pouring the last slab, when we were putting the cmu blocks in the first house already. And when we were doing the block-work in the last house, we were already putting the trusses in the first two. And the list goes on.
This stage was the most busy part of the project in all the aspects. A lot of logistics and managements was needed. However, we pulled it off 😎